Early Action







    Siaga 2 Hilir:
  • 1. Creating disaster maps
  • 2. Making Rootmap
  • 3. Identification of potential flooding in river basin of the Bengawan solo
  • 4. Monitoring weather conditions
  • 5. Determining the location of shelters and evacuation paths
    Siaga 1 Downstream:
  • 1. Preparation for rallying point and a temporary shelter if needed evacuation in the impacted flood areas

    Siaga 2 Hulu:
  • 1. Monitoring for rainfall
  • 2. Monitoring for water discharge
  • 3. Informing the monitoring results to the midstream and downstream areas
  • 4. Sending alert to the potential flood affected areas
  • 5. Identification for assembly point
  • 6. Inspecting for tools for early warning systems (AWLR)